Thanks a lot for bringing this into our notice. Currently its not available,
we will take a look into it in future releases. Just to understand the
problem you are trying to solve by throttling:
Are you trying to reduce the data that hits the DPM by all protected
client machines at the same time? DPM has built-in job throttling, to handle
when all client machines hit the DPM machine at the same time. Apart from
it, DPM clients try for sync for every 15 minutes with DPM but if its last
sync happened less than 4 hours it won't sync again. The 4 hours duration
can be changed during the PG creation. Given these feature set I don't see a
need for enabling throttling on client machines. On the contrary if you
enable for all client machines the jobs may take longer to sync with DPM and
end-up preventing other jobs to run. Or do you have any other reason to
control the traffic flow between all client machines to DPM machine, if so
can you please share with us? I Hope job throttling and ability to setup
time difference between two sync jobs should solve the problem.
Thanks,
Praveen D [MSFT]
This posting is provided "AS IS" with no warranties, and confers no rights.
Post by Adam WestlandRunning DPM 2010 RC and whenever I select multiple computers with protection
agents from the management tab, the 'throttle computer' option is greyed out.
I have 549 client computers and don't want to have to enter the throttling
settings on each one.
Please help.